Journal Check 9-21-18
Our Journal Check will consist of me looking at your journal work for completion and quality. You should have completed pages 1-6, and 70-72 (through “ION”), have the Periodic Table glued inside the front cover, and have the signed safety contract glued inside the back cover.
Leave a Reply