Journal Check 11-9-18

Our Journal Check will consist of me looking at your journal work for completion and quality.  You should have completed pages 1-16,  and 66-73.  Have the Periodic Table glued inside the front cover, and have the signed safety contract glued inside the back cover....
Skip to toolbar