Journal Check 1-31-17

Our Journal Check will consist of me looking at your journal work for completion and quality.  You should have completed pages 1-30, page 81, and 85-92, have the Periodic Table glued inside the front cover,  have the safety contract glued inside the back cover, and...
Skip to toolbar